Hydroelectric power plant Grmov vrh

Client Esotech, d.d.
Location Grmov vrh, Slovenia
Scope Of Work small hydroelectric power plant
Schedule 2014-2015

Project Detail

On Friday, the 11th of September 2015, as part of the project “Comprehensive supply of drinking water in Šaleška valley”, there was an opening of devices for the production of drinking water Grmov vrh.

Within water treatment system Grmov vrh we embed a small hydroelectric power plant, which is intended to cover its own consumption of electricity and with the possibility of the discharge of the surplus power to the grid.

Small hydroelectric power plant consists from Pelton turbine power 176 kW, generator and management system. The turbine is connected to the supply system wit flow Q=180 l/s and 114 m water drop.